Switchgear & changeover

Boards and changeover, matched to your supply.

We fit distribution boards, isolation, surge protection, and the switch between grid, solar, battery, or a generator.

Talk about your board
A finished distribution board with CHINT breakers and an isolation warning label.
In-progress inverter and distribution wiring, with tools and an open work area.
Wiring in progress on a distribution board.

What we plan for

  • Enough ways on the board, with circuits kept separate.
  • A changeover between supplies.
  • Surge protection and a way to isolate the board.
  • Solar, grid, and generator working together safely.

The final board and its ratings follow the load and how the property is supplied.

See this switchgear work